[1]
Dubey, O. 2019. DETERMINATION OF THE INPUT PARAMETERS OF THE WORK-STREAM OF THE OIL-GAS EJETOR USED SIMULTANEOUSLY WITH THE SUCKER-ROD PUMP. Prospecting and Development of Oil and Gas Fields. 1(70) (Mar. 2019), 60-69. DOI:https://doi.org/10.31471/1993-9973-2019-1(70)-60-69.